Advice Needed

I need to set up a table to define times when tasks will run. It needs to
allow for multiple times per day and if the task should run on the wends.
Once the task has run once for the specified service window for that time of
day I need to prevent the task from running again. I do not have a lot of
SQL experience and was wondering the best way to set up the table structure
might be. Any thoughts, examples or links would be greatly appreciated.
Thank you.>> I need to set up a table to define times when tasks will run. It needs t
o allow for multiple times per day and if the task should run on the wend
s. <<
CREATE TABLE TaskSchedule
(task_name CHAR(20) NOT NULL,
task_time DATETIME NOT NULL,
PRIMARY KEY (task_name, task_time),
.);
Just fill in the schedule for each task.
Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
events. What were you thinking about doing? We do not compute things
in SQL; we put them in tables and do joins.|||I'm wondering why you need a table. If the tasks are SQL Scripts, then just
run a scheduled DTS job or Store Procedure. You can create jobs to run at
the specific times and they would only run once. Plus you can have failure
emails if the job fails and will contact you.
"--CELKO--" wrote:

> CREATE TABLE TaskSchedule
> (task_name CHAR(20) NOT NULL,
> task_time DATETIME NOT NULL,
> PRIMARY KEY (task_name, task_time),
> ..);
> Just fill in the schedule for each task.
>
> Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
> events. What were you thinking about doing? We do not compute things
> in SQL; we put them in tables and do joins.
>|||Not sure myself becuase of my limited experience. I do know that I need the
ability to have my sproc run more then once in a day, possibly different
times on different days, and the ability to skip wends. Can I do all
this using a scheduled DTS job or sproc? Thank you.
"Darren" <Darren@.discussions.microsoft.com> wrote in message
news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...
> I'm wondering why you need a table. If the tasks are SQL Scripts, then
> just
> run a scheduled DTS job or Store Procedure. You can create jobs to run at
> the specific times and they would only run once. Plus you can have
> failure
> emails if the job fails and will contact you.
> "--CELKO--" wrote:
>|||Yes you can run the job except for the wends. In Enterprise Manager, go
to the Managment Folder, Expand SQL Server Agent, and you will see the jobs
section. Create a new job and in the Schedules tab create a new schedule an
d
you will see the options you can do. Good luck.
Darren
"Code Boy" wrote:

> Not sure myself becuase of my limited experience. I do know that I need t
he
> ability to have my sproc run more then once in a day, possibly different
> times on different days, and the ability to skip wends. Can I do all
> this using a scheduled DTS job or sproc? Thank you.
>
> "Darren" <Darren@.discussions.microsoft.com> wrote in message
> news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...
>
>sql

Advice Needed

I need to set up a table to define times when tasks will run. It needs to
allow for multiple times per day and if the task should run on the weekends.
Once the task has run once for the specified service window for that time of
day I need to prevent the task from running again. I do not have a lot of
SQL experience and was wondering the best way to set up the table structure
might be. Any thoughts, examples or links would be greatly appreciated.
Thank you.
>> I need to set up a table to define times when tasks will run. It needs to allow for multiple times per day and if the task should run on the weekends. <<
CREATE TABLE TaskSchedule
(task_name CHAR(20) NOT NULL,
task_time DATETIME NOT NULL,
PRIMARY KEY (task_name, task_time),
..);
Just fill in the schedule for each task.
[vbcol=seagreen]
Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
events. What were you thinking about doing? We do not compute things
in SQL; we put them in tables and do joins.
|||I'm wondering why you need a table. If the tasks are SQL Scripts, then just
run a scheduled DTS job or Store Procedure. You can create jobs to run at
the specific times and they would only run once. Plus you can have failure
emails if the job fails and will contact you.
"--CELKO--" wrote:

> CREATE TABLE TaskSchedule
> (task_name CHAR(20) NOT NULL,
> task_time DATETIME NOT NULL,
> PRIMARY KEY (task_name, task_time),
> ..);
> Just fill in the schedule for each task.
>
> Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
> events. What were you thinking about doing? We do not compute things
> in SQL; we put them in tables and do joins.
>
|||Not sure myself becuase of my limited experience. I do know that I need the
ability to have my sproc run more then once in a day, possibly different
times on different days, and the ability to skip weekends. Can I do all
this using a scheduled DTS job or sproc? Thank you.
"Darren" <Darren@.discussions.microsoft.com> wrote in message
news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...[vbcol=seagreen]
> I'm wondering why you need a table. If the tasks are SQL Scripts, then
> just
> run a scheduled DTS job or Store Procedure. You can create jobs to run at
> the specific times and they would only run once. Plus you can have
> failure
> emails if the job fails and will contact you.
> "--CELKO--" wrote:
|||Yes you can run the job except for the weekends. In Enterprise Manager, go
to the Managment Folder, Expand SQL Server Agent, and you will see the jobs
section. Create a new job and in the Schedules tab create a new schedule and
you will see the options you can do. Good luck.
Darren
"Code Boy" wrote:

> Not sure myself becuase of my limited experience. I do know that I need the
> ability to have my sproc run more then once in a day, possibly different
> times on different days, and the ability to skip weekends. Can I do all
> this using a scheduled DTS job or sproc? Thank you.
>
> "Darren" <Darren@.discussions.microsoft.com> wrote in message
> news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...
>
>

Advice Needed

I need to set up a table to define times when tasks will run. It needs to
allow for multiple times per day and if the task should run on the weekends.
Once the task has run once for the specified service window for that time of
day I need to prevent the task from running again. I do not have a lot of
SQL experience and was wondering the best way to set up the table structure
might be. Any thoughts, examples or links would be greatly appreciated.
Thank you.>> I need to set up a table to define times when tasks will run. It needs t
o allow for multiple times per day and if the task should run on the weekend
s. <<
CREATE TABLE TaskSchedule
(task_name CHAR(20) NOT NULL,
task_time DATETIME NOT NULL,
PRIMARY KEY (task_name, task_time),
.);
Just fill in the schedule for each task.
[vbcol=seagreen]
Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
events. What were you thinking about doing? We do not compute things
in SQL; we put them in tables and do joins.|||I'm wondering why you need a table. If the tasks are SQL Scripts, then just
run a scheduled DTS job or Store Procedure. You can create jobs to run at
the specific times and they would only run once. Plus you can have failure
emails if the job fails and will contact you.
"--CELKO--" wrote:

> CREATE TABLE TaskSchedule
> (task_name CHAR(20) NOT NULL,
> task_time DATETIME NOT NULL,
> PRIMARY KEY (task_name, task_time),
> ..);
> Just fill in the schedule for each task.
>
> Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
> events. What were you thinking about doing? We do not compute things
> in SQL; we put them in tables and do joins.
>|||Not sure myself becuase of my limited experience. I do know that I need the
ability to have my sproc run more then once in a day, possibly different
times on different days, and the ability to skip weekends. Can I do all
this using a scheduled DTS job or sproc? Thank you.
"Darren" <Darren@.discussions.microsoft.com> wrote in message
news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...[vbcol=seagreen]
> I'm wondering why you need a table. If the tasks are SQL Scripts, then
> just
> run a scheduled DTS job or Store Procedure. You can create jobs to run at
> the specific times and they would only run once. Plus you can have
> failure
> emails if the job fails and will contact you.
> "--CELKO--" wrote:
>|||Yes you can run the job except for the weekends. In Enterprise Manager, go
to the Managment Folder, Expand SQL Server Agent, and you will see the jobs
section. Create a new job and in the Schedules tab create a new schedule an
d
you will see the options you can do. Good luck.
Darren
"Code Boy" wrote:

> Not sure myself becuase of my limited experience. I do know that I need t
he
> ability to have my sproc run more then once in a day, possibly different
> times on different days, and the ability to skip weekends. Can I do all
> this using a scheduled DTS job or sproc? Thank you.
>
> "Darren" <Darren@.discussions.microsoft.com> wrote in message
> news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...
>
>

Advice Needed

I need to set up a table to define times when tasks will run. It needs to
allow for multiple times per day and if the task should run on the weekends.
Once the task has run once for the specified service window for that time of
day I need to prevent the task from running again. I do not have a lot of
SQL experience and was wondering the best way to set up the table structure
might be. Any thoughts, examples or links would be greatly appreciated.
Thank you.>> I need to set up a table to define times when tasks will run. It needs to allow for multiple times per day and if the task should run on the weekends. <<
CREATE TABLE TaskSchedule
(task_name CHAR(20) NOT NULL,
task_time DATETIME NOT NULL,
PRIMARY KEY (task_name, task_time),
..);
Just fill in the schedule for each task.
>> Once the task has run once for the specified service window for that time of day I need to prevent the task from running again. <<
Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
events. What were you thinking about doing? We do not compute things
in SQL; we put them in tables and do joins.|||I'm wondering why you need a table. If the tasks are SQL Scripts, then just
run a scheduled DTS job or Store Procedure. You can create jobs to run at
the specific times and they would only run once. Plus you can have failure
emails if the job fails and will contact you.
"--CELKO--" wrote:
> >> I need to set up a table to define times when tasks will run. It needs to allow for multiple times per day and if the task should run on the weekends. <<
> CREATE TABLE TaskSchedule
> (task_name CHAR(20) NOT NULL,
> task_time DATETIME NOT NULL,
> PRIMARY KEY (task_name, task_time),
> ..);
> Just fill in the schedule for each task.
> >> Once the task has run once for the specified service window for that time of day I need to prevent the task from running again. <<
> Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
> events. What were you thinking about doing? We do not compute things
> in SQL; we put them in tables and do joins.
>|||Not sure myself becuase of my limited experience. I do know that I need the
ability to have my sproc run more then once in a day, possibly different
times on different days, and the ability to skip weekends. Can I do all
this using a scheduled DTS job or sproc? Thank you.
"Darren" <Darren@.discussions.microsoft.com> wrote in message
news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...
> I'm wondering why you need a table. If the tasks are SQL Scripts, then
> just
> run a scheduled DTS job or Store Procedure. You can create jobs to run at
> the specific times and they would only run once. Plus you can have
> failure
> emails if the job fails and will contact you.
> "--CELKO--" wrote:
>> >> I need to set up a table to define times when tasks will run. It
>> >> needs to allow for multiple times per day and if the task should run
>> >> on the weekends. <<
>> CREATE TABLE TaskSchedule
>> (task_name CHAR(20) NOT NULL,
>> task_time DATETIME NOT NULL,
>> PRIMARY KEY (task_name, task_time),
>> ..);
>> Just fill in the schedule for each task.
>> >> Once the task has run once for the specified service window for that
>> >> time of day I need to prevent the task from running again. <<
>> Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
>> events. What were you thinking about doing? We do not compute things
>> in SQL; we put them in tables and do joins.
>>|||Yes you can run the job except for the weekends. In Enterprise Manager, go
to the Managment Folder, Expand SQL Server Agent, and you will see the jobs
section. Create a new job and in the Schedules tab create a new schedule and
you will see the options you can do. Good luck.
Darren
"Code Boy" wrote:
> Not sure myself becuase of my limited experience. I do know that I need the
> ability to have my sproc run more then once in a day, possibly different
> times on different days, and the ability to skip weekends. Can I do all
> this using a scheduled DTS job or sproc? Thank you.
>
> "Darren" <Darren@.discussions.microsoft.com> wrote in message
> news:9AE28789-D43D-422F-B185-D682C5BF289A@.microsoft.com...
> > I'm wondering why you need a table. If the tasks are SQL Scripts, then
> > just
> > run a scheduled DTS job or Store Procedure. You can create jobs to run at
> > the specific times and they would only run once. Plus you can have
> > failure
> > emails if the job fails and will contact you.
> >
> > "--CELKO--" wrote:
> >
> >> >> I need to set up a table to define times when tasks will run. It
> >> >> needs to allow for multiple times per day and if the task should run
> >> >> on the weekends. <<
> >>
> >> CREATE TABLE TaskSchedule
> >> (task_name CHAR(20) NOT NULL,
> >> task_time DATETIME NOT NULL,
> >> PRIMARY KEY (task_name, task_time),
> >> ..);
> >>
> >> Just fill in the schedule for each task.
> >>
> >> >> Once the task has run once for the specified service window for that
> >> >> time of day I need to prevent the task from running again. <<
> >>
> >> Use a query with "task_time >= CURRENT_TIMESTAMP" so you ignore past
> >> events. What were you thinking about doing? We do not compute things
> >> in SQL; we put them in tables and do joins.
> >>
> >>
>
>sql

Sunday, March 11, 2012

Advanced Execution Plan Question

I have a scenario where I have 3 tables joined together. The first is the
"main" table that will define the result set. The second is a lookup table;
the main table has a foreign key to it. The third is a detail table; it has
a foreign key to the main table. Both the second and third tables are on
the right side on a LEFT OUTER JOIN. In this particular query, I only need
the detail data for a particular row if the lookup row exists. The reason
for this is that if the lookup row exists, it will be used to further filter
the result set based upon a value in the detail row. But if the lookup row
doesn't exist, there's no need to lookup the detail row. In order to
optimize the query I attempted to add an additional condition to the ON
clause joining the main and detail table saying only join if the lookup key
is not null:
SELECT
...
FROM
tbFilterTest F
LEFT JOIN tbFilterTestLookup L ON F.LookupID = L.LookupID
LEFT JOIN tbFilterTestDetail D ON L.LookupID IS NOT NULL
AND
F.FilterID
= D.FilterID
My hope was that in the join in the execution plan that there would be an
argument "L.LookupID <> null". What I'm ending up with in the actual
execution plan is the "L.LookupID <> null" is not in the join but its
showing up as an argument in the index s for the inner input, meaning
(I'm thinking) that the s is still getting executed and then the
"L.LookupID <> null" is being applied afterward, which means the s was
wasted if "L.LookupID = null".
Now I put together the 3 tables listed above to test this more closely.
Interestingly enough, the "L.LookupID <> null" argument WAS in the join and
not in the inner input, meaning the index s was not being performed on
the detail table when the lookup was null. HOWEVER, I noticed the inner
input (detail table) was having an index scan because I didn't have an index
on FilterID. Once I put the index on FilterID on the detail table, the
"L.LookupID <> null" moved back to the inner input (detail) index s!
I'm trying to understand the logic of this and also wonder if there is a way
to make the "L.LookupID <> null" always occur in the join. The actual
query I'm doing this for is very vital and regularly executed.
Below is DDL, sample data, and the query. Also is the index that "makes the
difference". If you execute the query without the index and then with the
index, you should see the "L.LookupID <> null" move from the join to the
inner input index s. Note that the sample query simply demonstrates "the
moving WHERE clause" in the execution plan. It does not demonstrate the
condition in my real query that moved me to try and accomplish this.
Thanks,
Mike
----
SET NOCOUNT ON
GO
IF EXISTS (SELECT * FROM sysobjects where name = 'tbFilterTestDetail')
DROP TABLE tbFilterTestDetail
GO
IF EXISTS (SELECT * FROM sysobjects where name = 'tbFilterTest')
DROP TABLE tbFilterTest
GO
IF EXISTS (SELECT * FROM sysobjects where name = 'tbFilterTestLookup')
DROP TABLE tbFilterTestLookup
GO
CREATE TABLE tbFilterTestLookup
(
LookupID int NOT NULL CONSTRAINT PK_FilterTestLookup PRIMARY KEY
)
GO
INSERT tbFilterTestLookup (LookupID) VALUES (1000)
INSERT tbFilterTestLookup (LookupID) VALUES (2000)
INSERT tbFilterTestLookup (LookupID) VALUES (3000)
INSERT tbFilterTestLookup (LookupID) VALUES (4000)
INSERT tbFilterTestLookup (LookupID) VALUES (5000)
INSERT tbFilterTestLookup (LookupID) VALUES (5001)
INSERT tbFilterTestLookup (LookupID) VALUES (5002)
INSERT tbFilterTestLookup (LookupID) VALUES (5003)
INSERT tbFilterTestLookup (LookupID) VALUES (5004)
INSERT tbFilterTestLookup (LookupID) VALUES (5005)
INSERT tbFilterTestLookup (LookupID) VALUES (5006)
INSERT tbFilterTestLookup (LookupID) VALUES (5007)
INSERT tbFilterTestLookup (LookupID) VALUES (5008)
INSERT tbFilterTestLookup (LookupID) VALUES (5009)
INSERT tbFilterTestLookup (LookupID) VALUES (5010)
INSERT tbFilterTestLookup (LookupID) VALUES (5011)
INSERT tbFilterTestLookup (LookupID) VALUES (5012)
INSERT tbFilterTestLookup (LookupID) VALUES (5013)
INSERT tbFilterTestLookup (LookupID) VALUES (5014)
GO
CREATE TABLE tbFilterTest
(
FilterID int NOT NULL CONSTRAINT PK_FilterTest PRIMARY KEY,
LookupID int NOT NULL
)
GO
INSERT tbFilterTest (FilterID, LookupID) VALUES (100, 10) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (200, 11) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (300, 12) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (400, 1000) -- Match
INSERT tbFilterTest (FilterID, LookupID) VALUES (500, 13) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (600, 14) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (700, 20) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (800, 20) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (900, 20) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (620, 20) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (730, 20) -- No match
INSERT tbFilterTest (FilterID, LookupID) VALUES (840, 20) -- No match
GO
CREATE TABLE tbFilterTestDetail
(
DetailID int IDENTITY (10000, 1) NOT NULL CONSTRAINT PK_tbFilterTestDetail
PRIMARY KEY,
FilterID int NOT NULL CONSTRAINT FK_tbFilterTestDetail_tbFilterTest
REFERENCES tbFilterTest (FilterID),
Descrip varchar(128) NOT NULL
)
GO
CREATE INDEX IX_tbFilterTestDetail_FilterID ON tbFilterTestDetail (FilterID)
GO
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (100, '100-1-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (100, '100-2-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (200, '200-1-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (200, '200-2-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (300, '200-1-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (300, '200-2-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (400, '400-1-match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (400, '400-2-match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (500, '500-1-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (500, '500-2-no match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (600, '600-1-match')
INSERT tbFilterTestDetail (FilterID, Descrip) VALUES (600, '600-2-match')
GO
-- Sample Query
SELECT
F.FilterID,
L.LookupID,
D.Descrip
FROM
tbFilterTest F
LEFT JOIN tbFilterTestLookup L ON F.LookupID = L.LookupID
LEFT JOIN tbFilterTestDetail D ON L.LookupID IS NOT NULL -- this is
the condition that moves in the execution plan
AND
F.FilterID =
D.FilterID
-- Magic index: try sample query w/ and w/o
CREATE INDEX IX_tbFilterTestDetail_FilterID ON tbFilterTestDetail (FilterID)
GOOn Thu, 18 Aug 2005 13:53:36 -0400, Mike Jansen wrote:
(snip)
>Both the second and third tables are on
>the right side on a LEFT OUTER JOIN. In this particular query, I only need
>the detail data for a particular row if the lookup row exists.
Hi Mike,
Then why use a LEFT OUTER JOIN' Outer joins should only be used if
you must retain rows from one table even though there is no match in the
other table. The standard join type (INNER JOIN) will retain only rows
that match (as per your request) and will probably perform faster as
well.
SELECT ...
FROM tbFilterTest AS F
INNER JOIN tbFilterTestLookup AS L
ON F.LookupID = L.LookupID
LEFT JOIN tbFilterTestDetail AS D
ON F.FilterID = D.FilterID
If you are sure that there will always be at least one matching row in
the FilterTestDetail table, change the second join to an INNER JOIN as
well. It won't change the results, but it might speed up the
performance.
Best, Hugo
--
(Remove _NO_ and _SPAM_ to get my e-mail address)

Advance PIVOT function in SQL2005

Below is an example of a pivot table from the help in SQL2005.
My question: Do you have to manually define the columns ([164], [198], etc.) for the pivot?

I would like to use this for a daily report where the columns would be the dates?

Thanks.

GO
SELECT VendorID, [164] AS Emp1, [198] AS Emp2, [223] AS Emp3, [231] AS Emp4, [233] AS Emp5
FROM
(SELECT PurchaseOrderID, EmployeeID, VendorID
FROM Purchasing.PurchaseOrderHeader) p
PIVOT
(
COUNT (PurchaseOrderID)
FOR EmployeeID IN
( [164], [198], [223], [231], [233] )
) AS pvt
ORDER BY VendorIDThis is not standardized SQL. You may want to ask in a product-specific group|||moving thread to SQL Server forum|||My question: Do you have to manually define the columns ([164], [198], etc.) for the pivot?Yes. To have an unknown number of columns\ values you need to use dynamic sql.
http://www.sommarskog.se/dynamic_sql.html

Thursday, February 9, 2012

admin or other role

I have one other question. How do you define roles? What role(s) are required to fully administer SQL Server? What role(s) are required to fully administer a single database in SQL Server?

thanks,

In Books Online, look up [fixed server roles] and [fixed database roles].

Those roles are predefined. You can also create your own roles (which only has permissions that you grant to them.)

Full server administration = sysadmin.

Single database administration = db_owner.